Heathrow Main and Cargo Tunnel refurbishment
Name: Heathrow Main and Cargo Tunnel refurbishment
Country: United Kingdom
Client: Heathrow Airport Authority
Client Contractor: VVB Engineering Services
Main Consultant: Atkins & Mott Macdonald
Project Year: 2015
Sector: Transportation - Airports
Project Description: The project involves the refurbishment of the main airport road tunnel and cargo tunnel at Heathrow. This entailed the replacement of most of the mechanical and electrical systems
Scope of Work:

After the successful completion and delivery of the detailed design, PBE was awarded the contract for the supply, testing and commissioning of the radio communication equipment, public and domestics radio re-broadcast equipment, with emergency voice break in, GSM and PCN mobile phone re-broadcast, radiating cable and distributed antenna system.


Doha Red Line
Name: Doha Red Line
Country: Qatar
Client: Qatar Rail
Client Contractor: Salini Impregilo (MTA: SAL)
Main Consultant: Jacobs Engineering Group (NYSE: JEC)
Project Year: 2014
Sector: Transportation - Rail
Project Description: The Red Line North Underground extends in a northerly direction from the station Mushaireb for approximate length of 13km through seven new underground stations.
Scope of Work:

PBE was responsible for the design, supply testing and commissioning of the contemporary leaky feeder and distributed antenna communication system


East Side Access Tunnel - New York
Name: East Side Access Tunnel - New York
Country: United States
Client: Metropolitan Transport Authority
Client Contractor: Frontier Kemper
Main Consultant: Gall Ziegler Consultants
Project Year: 2015
Sector: Transportation - Rail
Project Description: The Metropolitan Transportation Authority's (MTA) East Side Access project is the biggest transportation infrastructure project being implemented in North America. Construction works for the $10.17bn project began in 2002 and are scheduled for completion in December 2022. East Side Access project involves the expansion of the Long Island Rail Road (LIRR), the busiest commuter railroad in the US. It will provide an alternative new stop for all the 11 LIRR branches at a new terminal and concourse being built beneath Grand Central Terminal (GCT) and include 11 miles (17.7km) of tunnelling works at Queens Borough and Manhattan.
Scope of Work:

PBE was awarded the contract to provide a Leaky Feeder Communication System


Seattle Tunnel Partners Project
Name: Seattle Tunnel Partners Project
Country: United States
Client: Washington State Department of Transport
Client Contractor: Dragados USA / Tutor Perini Corporation
Main Consultant: Parson Brinckerhoff
Project Year: 2014-2015
Sector: Utilities - Water Viaduct
Project Description: The Alaskan Way Viaduct replacement tunnel is a bored road tunnel that is under construction in the city of Seattle in the U.S. state of Washington. The project has been stalled since December 2013. No firm date for if/when the project will continue has been set.[3] The 2-mile (3.2 km) tunnel would carry State Route 99 under Downtown Seattle from the SoDo neighborhood to South Lake Union in the north
Scope of Work:

PBE was awarded the contract to provide a traditional Leaky Feeder communication system and an emergency evacuation system during the construction phase


Elizabeth River Tunnel Project - Portsmouth VA
Name: Elizabeth River Tunnel Project - Portsmouth VA
Country: United States
Client: Virginia Department of Transportation
Client Contractor: Skanska Infrastructure, Kiewit Construction and Weeks Marine (SKW Construction)
Main Consultant: Parson Brinckerhof & Volker and Associates
Project Year: 2015
Sector: Transportation - Highways
Project Description: Elizabeth River Tunnels Project (ERTP) includes construction of a new tunnel in place of the Midtown tunnel and restoration of existing Downtown tunnels in Virginia, USA. The tunnels connect Norfolk and Portsmouth cities in the Hampton roads region.
Scope of Work:

PBE was awarded the contract to provide a Leaky Feeder Communication System


Bond Street Station Upgrade
Name: Bond Street Station Upgrade
Country: United Kingdom
Client: Transport for London
Client Contractor: Costain (LON: COST) and Laing o Rourke JV
Main Consultant: C2HM Hill and Atkins JV
Project Year: 2013
Sector: Transportation - Rail
Project Description: The project involved the upgrading of the existing underground station to deliver and increase the current capacity from 155,000 passengers per day to 225,000 passengers per day
Scope of Work:

PBE was responsible for not only the design, supply testing and commissioning of the contemporary leaky feeder communication system but also provided a voice over IP phone system and environmental monitoring system


Hammersmith Flyover
Name: Hammersmith Flyover
Country: United Kingdom
Client: Transport for London
Client Contractor: Costain (LON: COST)
Main Consultant: Parson Brinckerhoff
Project Year: 2013
Sector: Transportation - Highways
Project Description: The project involved the strengthening of the flyover in order to prolong its life and ensure that no further maintenance will be required in the near future.
Scope of Work:

PBE was responsible for the design, supply testing and commissioning of the temporary communication and environmental monitoring systems. As a result of the confined space and multiple entry and exit points, the client also required that PBE provide a Tagging and Tracking solution. All of these systems where controlled and monitored via the MineBoss software systems.


Crossrail C310 - Thames Tunnel Plumstead to North Woolwich
Name: Crossrail C310 - Thames Tunnel Plumstead to North Woolwich
Country: United Kingdom
Client: Crossrail
Client Contractor: Hochtief and Murphy JV
Main Consultant: Atkins, Mott Macdonald, Ove Arup, Jacobs Engineering, Scott Wilson, WSP UK
Project Year: 2013-2014
Sector: Transportation - Rail
Project Description: Once completed the Thames tunnels will be approximately 2.6km long and 15m below the existing riverbed, this tunnel will be the only point where the crossrail route crosses the river Thames
Scope of Work:

PBE was responsible for the design, supply, testing and commissioning of the radio communication, public address and voice alarm systems, and emergency voice break in system. PBE also provided surface coverage and a remote site link


Crossrail C510 - Liverpool Street and Whitechapel
Name: Crossrail C510 - Liverpool Street and Whitechapel
Country: United Kingdom
Client: Crossrail
Client Contractor: BBMV (Balfour Beatty, Morgan Sindal and Vinci JV)
Main Consultant: Atkins, Mott Macdonald, Ove Arup, Jacobs Engineering, Scott Wilson, WSP UK
Project Year: 2013-2014
Sector: Transportation - Rail
Project Description: Project entailed the construction of the early access shafts and sprayed concrete linings within the Whitechappel and Liverpool station tunnels.
Scope of Work:

PBE was responsible for the design, supply, testing and commissioning of a contemporary leaky feeder communication system, public address and voice alarm system with a Fire Brigade and emergency services voice break in systems. The client also required a telephone interconnect system which PBE provided.


TTC York Expansion
Name: TTC York Expansion
Country: Canada
Client: OHL
Client Contractor: Direct
Main Consultant: N/A
Project Year: 2013-2014
Sector: Transportation - Highways
Project Description: The Toronto Transmit Commission (TTC) York-Spadina subway extension entailed the construction of one, twin bore tunnel approx. 8k long. The scheme was part of the Toronto Transit Commission project to provide a critical extension between the city of Toronto and the regional municipality of York.
Scope of Work:

PBE was responsible for the design, supply and testing and commissioning of a temporary leaky feeder communication and fixed emergency telephone system.


Quebrada Blanca Road Tunnel
Name: Quebrada Blanca Road Tunnel
Country: Colombia
Client: Coviandes
Client Contractor: Servicom
Main Consultant: N/A
Project Year: 2011-2012
Sector: Transportation - Highways
Project Description: The project required the construction of an intermediary, two section road tunnel. The first section is approx. 400m long, the second being 250m long with a section of 72m between the opening of each tunnel
Scope of Work:

The client required a communication system that would allow emergency operations to be carried out within the tunnels. PBE was awarded the contract to design, supply, test and commission the voice communication system that included a FM re-broadcasting and voice break in. The system is operated and controlled from remote control centres.


Boqueron Road Tunnel
Name: Boqueron Road Tunnel
Country: Colombia
Client: Coviandes
Client Contractor: Servicom
Main Consultant: N/A
Project Year: 2011
Sector: Transportation - Highways
Project Description: The project entailed the construction of a single road tunnel approximately 2.4km in length.
Scope of Work:

PBE was awarded the contract and asked to carry out the design, supply, testing and commissioning of the communication system. The client was very specific in their requirements and wanted a system that provided a certain level of redundancy which would also allow the voice break in of emergency services on both the VHF and FM frequencies. The client also required that the whole system be controlled and monitored from a remote location. In order to satisfy the client requirement PBE designed a passive system with a minimal amount of active components, which also reduced the amount of maintenance that would be required.


M25 Tunnel Refurbishment – Holmesdale and Bell Common
Name: M25 Tunnel Refurbishment – Holmesdale and Bell Common
Country: United Kingdom
Client: Highway Agency
Client Contractor: Costain (LON: COST)
Main Consultant: Capita Symonds
Project Year: 2007 and 2010
Sector: Transportation - Roads and Highways
Project Description: This project entailed the construction on a dual tunnel carriageway, each approximately 500m long.
Scope of Work:

PBE was awarded the contract for the design, supply, testing and commissioning a safety critical operating systems that would enable and facilitate the communication of both the operational and emergency response teams. The system had to be functional on both the VHF/UHF and Tetra communication bands. In order to reduce the amount of maintenance that woul be required, the client requested a minimal amount of active components are installed within the tunnel.