This project included the design, construction and commissioning of the following;
- 66/11kV 20MVA Substation
- 11kV/433V Substations around the site
- 11kV Switchrooms
- 11kV Cabling
- Boxcut Earthing Compound
- Communications Cabling
The switchrooms were designed and manufactured at our Tomago Facility, transported to site and craned into position with the benefits of this concept including minimal site works most testing taking place off site. PBE were responsible for the design, electrical/structural engineering, PLC/SCADA design, project management, reticulation systems, communications cabling, earthing system design & testing, switchroom manufacture, substation construction and commissioning.
Australia
Whitehaven Coal
Direct Service Provider
Direct Service Provider
2017
Coal Mining Electrical Permanent Infrastructure